Codebase for the datahousing server deployed on Brandeis-LLC site as a part of CLAMS Project.
At the moment, the server is used to resolve AAPB GUIDs to local file paths, and works with the accompanying client, mmif-docloc-baapb MMIF plugin.
The server deployment address is stored as a organization variable. To use the server (and baapb scheme in MMIF document locations), set BAAPB_RESOLVER_ADDRESS environment variable to the deployment address, and install the client plugin.
All brandeis tagged pre-built container images (available in https://github.com/orgs/clamsproject/packages)
There are API routes for (1) searching the assets (typically videos, audio streams and transcripts), (2) uploading MMIF files, (3) downloading MMIF files, and (4) retrieving MMIF storage analytics.
Searching assets
To query available assets use the searchapi route with these three query string parameters:
guid(required) — part of the AAPB GUID to search for (min. 3 characters)file— the type of the file to search for: up to three oftext,image,audio,video,markupandotheronlyfirst— when used only the first match will be returned, default is false
Examples (these use URLs as if you have deployed your own server (see below)):
curl '127.0.0.1:8001/searchapi?guid=zw18'
curl '127.0.0.1:8001/searchapi?guid=507-zw18k75z4h'
curl '127.0.0.1:8001/searchapi?guid=507-zw18k75z4h&file=video'
curl '127.0.0.1:8001/searchapi?guid=507-zw18k75z4h&file=video&file=other'
curl '127.0.0.1:8001/searchapi?guid=507-zw18k75z4h&onlyfirst=true'
These return a message if no file was found, a list of server paths or a single path (if onlyfirst was used).
Uploading MMIF files
For this you use the storeapi/upload route:
curl -X POST 127.0.0.1:8001/storeapi/upload -d @<some_mmif_file>
curl -X POST 127.0.0.1:8001/storeapi/upload?overwrite=True -d @<some_mmif_file>
In the first case you get a warning if a file was already uploaded, in the second case existing files will be overwritten.
Downloading MMIF files
This uses the storeapi/download route. There are three modes. In the zero-guid mode you just hand in a pipeline specification and the server returns the server path and all files at that path:
curl -X POST 127.0.0.1:8001/storeapi/download \
-H 'Content-Type: "application/json"' \
-d '{"pipeline": {"swt-detection/v2.0-38-g7838415": {"pretty": "True"}}}'{
"filenames": [
"cpb-aacip-690722078b2"
],
"pipeline": "/Users/Shared/aapb/storage-test/swt-detection/v2.0-38-g7838415/5fe49d06725497b274b6eaaf0fe0c5d2"
}If you add a guid then the server will return a MMIF file or a warning if the file did not exist:
curl -X POST 127.0.0.1:8001/storeapi/download
-H 'Content-Type: "application/json"'
-d '
{
"pipeline": { "swt-detection/v2.0-38-g7838415": {"pretty": "True"} },
"guid": "NON-EXISTING GUID"
}'{
"error": "Did not find: NON-EXISTING GUID"
}With a list of guids you get a dictionary:
curl -X POST 127.0.0.1:8001/storeapi/download \
-H 'Content-Type: "application/json"' \
-d '
{
"pipeline": { "swt-detection/v2.0-38-g7838415": {"pretty": "True"} },
"guid": ["cpb-aacip-690722078b2", "NO-SUCH-GUID"]
}'{
"NO-SUCH-GUID": {
"error": "Did not find: NONE"
},
"cpb-aacip-690722078b2": {
...
}MMIF storage analytics
To retrieve information on the status of data in the MMIF storage directory, use the storeapi/status route:
curl -X GET 127.0.0.1:8001/storeapi/status
This returns a dictionary with information on the full pipeline, e.g.:
{
"dirty_pipeline_mmif_count": 0,
"non_terminal_mmif_count": 1,
"pipelines": [
{
"mmif_count": 1,
"path": "swt-detection/v7.4/3fd99622c1a78613dc21c3dc4984e6fe",
"spec": {
"swt-detection/v7.4/3fd99622c1a78613dc21c3dc4984e6fe": {
"pretty": "true",
"tfAllowOverlap": "false",
"tfLabelMap": "['I:chyron', 'Y:chyron', 'N:chyron']",
...
}
}
},
{
"mmif_count": 1,
"path": "swt-detection/v7.4/3fd99622c1a78613dc21c3dc4984e6fe/tesseract/v2.0/e0ba0bab08a08fda1ed9f16d35bd21aa",
"spec": {
"swt-detection/v7.4/3fd99622c1a78613dc21c3dc4984e6fe": {
...
},
"tesseract/v2.0/e0ba0bab08a08fda1ed9f16d35bd21aa": {
...
}
}
},
{
"mmif_count": 1,
"path": "swt-detection/v7.4/3fd99622c1a78613dc21c3dc4984e6fe/doctr-wrapper/v1.4/e0ba0bab08a08fda1ed9f16d35bd21aa",
"spec": {
"doctr-wrapper/v1.4/e0ba0bab08a08fda1ed9f16d35bd21aa": {
...
},
"swt-detection/v7.4/3fd99622c1a78613dc21c3dc4984e6fe": {
...
}
}
}
],
"total_mmif_files": 3,
"total_pipelines": 3
}Install all the python dependencies with pip install -r requirements.txt, and configure your server using .env file or via environment variables (See .env.sample file for an example).
FLASK_APP: must beapiFLASK_DEBUG: set to1to enable debug mode, otherwise0FLASK_RUN_PORT: port number to listen onFLASK_RUN_HOST: hostname to listenASSET_DIR: path to the directory on the server where the AAPB media files (assets) are storedBUILD_DB: set to1to build the database from scratch, otherwise0
Start the server with flask run.